|
|
||||||
Section |
Starting Page | Problems | Due Date |
| 1.1 | p. 34 | 9,10,17,22,23 | 4/4 (Fri) |
| 1.1 | p. 39 | 24 | 4/9(Wed) |
| 2.1 | p. 66 | 1,6,11 | |
| 2.2 | p. 80 | 2,3(a-c), 5(a-c),8 | |
| 2.5 | p. 118 | 2,3,5 | 4/11 (Fri) |
| Topic request for project | 4/14 (Mon) |
||
| 3.4 | p. 219 | 2, 3a&d, 4b, 5, 6a, 7 | 4/18 (Fri) |
| 3.5 | p. 232 | 1,3,5 | 4/25 (Fri) |
| 3.6 | p.241 | 1,2ab,3,4,5 | 5/7 (Wed) |
| 4.2 | p.272 | 2,3,4,7,12,13 | 5/9 (Fri) |
| 4.1 | p. 260 | 8,10,12abd,13ab,16 | 5/14 (Wed) |
| 4.4 | p. 294 | 5 | 5/21 (Wed) |
| 4.5 | p. 304 | 2cd,4,5,11,12 | |
| 4.5 | p. 304 | 8,9 | 5/23 (Fri) |
| 4.6 | p.312 | 1,3 |